Software Quality Management

How we review the quality practices one software project follows, and turn the team's answers into scores and findings.

  • 14areas, from requirements and engineering to security, team happiness and AI
  • 248practices, each answered Yes, No or Not sure
  • 10 · 5 · 2the weights of Critical, Important and Minor practices
  • 0–10a score per area, and an overall score once every question has an answer
Start Software Quality Management

Free to start, live in two clicks.

Step 1 of 4Each team member picks their role, and sees the areas that apply to it.

What is the Software Quality Management report?

A review of how well one software project follows good quality practices. The project's team answers Yes, No or Not sure to plain questions, such as whether code is reviewed or backups are scheduled, in 14 areas from engineering and testing to security, management and team happiness.

The report gives each area a score out of 10, lists what is missing with the most important first, and shows what nobody could confirm. A consultant can then audit the answers, and the report shows the gaps between the audit and the team's answers.

How it works

One run per project: the team answers, the report scores every area, and a consultant can audit the answers.

  1. Launch it for one project. Everyone on the project gets the same link.
  2. Everyone answers. Each person picks a role and gets its practices: Yes, No or Not sure, one per screen.
  3. Each area gets a score. Out of 10, from the practices in place: Critical counts 10, Important 5, Minor 2.
  4. The team's report. Scores per area, the unmet practices most important first, and what nobody could confirm.
  5. Optional: A consultant's audit. They mark Yes or No per practice, and the report shows the gaps against the team's answers.

The short version

One run per project, answered by its team. Each person picks their role and reviews the practices that apply to it, one yes-or-no question per screen: is the code reviewed, are backups scheduled, are requirements clear before work starts.

Each practice has an importance (Critical, Important or Minor), and each area gets a score out of 10 from the weight of the practices in place. The report lists what is unmet, most important first, and what nobody could confirm. Answers are self-reported: the survey finds where to look, and a consultant can audit them after.

Fourteen areas

The 248 practices sit in 14 areas. Eight areas are for the technical role, three for management, one for design, and two, AI Amplifiers and Team Happiness, for everyone. By default 178 practices are Critical, 46 Important and 24 Minor.

A made-up project's scores, drawn as the report draws them.

Every practice is a plain question: it starts with the verb, stays under about ten words, and keeps its examples on a second line. Where the original rule was phrased so that No was good, it was turned around, so Yes is always the good answer.

Roles and routing

The first question routes everything after it. Someone can pick more than one role, and sees the areas for each of them plus the ones for everyone.

What's your role on this project?

Pick all that apply.

  • TechnicalEngineering, architecture, frontend, backend, data, testing, operations, or security153 practices · about 15 min
  • DesignUX/UI or accessibility26 practices · about 3 min
  • ManagementProduct, project management, or compliance93 practices · about 9 min

All three roles together: all 248 practices. The time is an estimate of six seconds a question, as the app shows it.

Each practice question offers the same three answers: Yes, No, Not sure. "Not sure" is there on purpose: a practice someone can't see from where they sit isn't a No. The report collects those for the team to clarify.

From answers to a score

  1. Each practice carries a weight from its importance: Critical 10, Important 5, Minor 2. The defaults come with the survey; the run's configuration can change which practices apply to the project and how important each one is.
  2. An area's score is the weight of its Yes answers over the weight of everything answered Yes or No, scaled to 10. With several people answering, a practice gets credit for its share of Yes among its Yes and No answers.
  3. Not sure and unanswered are not No. Not sure counts as answered but adds nothing either way; a practice nobody answered is left out of the score and lowers coverage.
  4. The overall score is the plain average of the area scores, each area weighing the same. It shows only once every applicable question has an answer of any kind, which usually takes people from each role.

Try it on four practices of one area, as one person would answer them:

  • Is project code version-controlled?Critical · 10
  • Is there a code review process?Critical · 10
  • Is there a coding style guide?Important · 5
  • Are dependencies kept up to date?Minor · 2

Area score

6.0 / 10

5 to below 8

10 × 15 ÷ 25: the weight of the Yes answers over the weight of everything answered Yes or No.

Reading a score

The report colors scores in four bands. In its own words, they are review guides, not validated thresholds: there is no benchmark behind them.

  1. <2Below 2needs attentionMost of the area's weight is unmet.
  2. 2+2 to below 5needs attentionUnmet practices outweigh the met ones.
  3. 5+5 to below 8on trackMost practices are in place; a few gaps to close.
  4. 8+8–10on trackThe area's practices are in place.

Findings, not grades

A score says how much of an area is in place; the findings say what to do. Each area gets a status from its practices, and the areas are ordered so the top rows are where to act: most Critical unmet practices first, then the most unmet weight.

  • Fully unmet: every applicable practice in the area was answered No, and none got a Yes.
  • Partly unmet: at least one practice is unmet. A practice is unmet as soon as anyone answers No; with a Yes from someone else it shows as partly unmet, with the counts, so disagreement shows instead of averaging away.
  • Incomplete: nothing is unmet, but a practice is unanswered or only Not sure.
  • Fully met: everything applicable has a Yes and no No.

Where the team isn't sure lists every practice with a Not sure, most unsure first: a high share means the practice isn't visible to the people asked, and needs clarifying before it counts as met or unmet.

What the report shows

A sample project's report, down to the findings by area, with fictional answers.
  • Top summary: the overall score out of 10 on a gauge, answer coverage, practices to improve (applicable practices someone answered No) and the Not sure count.
  • Quality profile: one spoke per area on a radar, scored 0 to 10, so the dents toward the middle are the weak areas.
  • Section scores: every area with its score and "answered · not sure" counts; open one to see each practice's answers, like "Yes (2) / No (1)".
  • Findings by area and Where the team isn't sure, as above.
  • Export: a PDF with the summary, the profile, the scores, the findings and an appendix of every answer with its weight.
  • Audit: a second look at the team's answers, practice by practice, described below.

The run's Configuration tab chooses which practices apply to the project and how much each counts, and it re-scores answers already given, so a project can drop a practice that doesn't apply instead of answering No to it.

The Trends tab shows the overall score, practices met, critical practices met and answer coverage for up to 12 earlier runs, each with its change from the run before, as cards, a chart and a table. The report compares only with the earlier reports you pick for it, such as the same team's last rounds: how Trends work.

The Trends tab of a sample report, compared with its earlier rounds, with fictional data.

The audit, a second level

The report comes in two levels. First the team assesses itself, as above. Then someone who manages the report, often a consultant, goes through the same practices on the report's Audit tab and marks Yes or No for what they found, with a note for the team where it helps. Team happiness is not audited: nobody can check another person's experience.

  • Gaps: the score after the audit next to the team's, how much of the report was checked, and the practices the team said Yes to that the auditor found missing, to double-check with the team.
  • The audited score is the same report with the auditor's answer wherever one was marked. Unchecked practices keep the team's answer, so the difference is exactly what the audit changed.
  • Insights shows it too, as a line under the summary, a dashed shape on the radar and an Audited column, and so do the PDF, the exports and the AI connection.
  • Nobody sees half an audit. While it is in progress only the people who manage the report see it; once it is marked complete, everyone who can open the report does.

Where the practices come from

The practices come from a software quality management checklist used in delivery reviews of real projects: 241 rules in 12 categories, with the weights Critical 10, Important 5 and Minor 2, plus 7 new questions on team happiness. For the survey the rules became questions, the project management category was split into Product & Requirements and Project & Team Management, and the scoring was changed in two ways: an unfavourable answer scores a true zero, and areas average equally.

Who sees what

  • It can run anonymously. The launch window starts with a shared password and no names. You can ask for a name or an email instead, or have people sign in with Google or an emailed link, and then the Responses tab names people.
  • Whoever can open the report sees every answer, grouped by section, and can export the PDF. A public link, if one is made, shows the Insights only, as aggregates.
  • An audit's notes are for the team. They show to everyone who can open the report once the audit is complete, never on a public link.
  • Team happiness answers are one person's experience. The area counts like any other, so in a small team the report can point to one person.

Limits

  • Self-reported. Several people answering the same question can expose a disagreement, but not settle who is right. Treat a finding as something to check, or have the answers audited.
  • No benchmark. There are no company averages, and the bands aren't validated thresholds.
  • Trends compare the earlier runs you pick, such as the same project's, and scores are only comparable while the areas and the configuration stay the same.
  • Coverage matters. The overall score waits for every applicable question, and a run with a single role answering scores that role's areas only.

Don't renew your
AI licenses blind.

Before the renewal, see which teams get value from AI,
which don't, and why.